Construction Cleaning Case Studies Ireland

Real Projects. Real Clients. Real Results.

Our Partners

7-School Renovation Clean — Tullamore, Co. Offaly

Hexaclean Solutions delivered post renovation cleaning across 7 schools in Tullamore for Dominic O'Connor Construction. Each building was cleaned to handover standard — on schedule, on spec, every time.

Mirror-finish floor in a healthcare corridor after builders clean in Ireland

Baltinglass Post Renovation Clean — Co. Wicklow

Post renovation cleaning completed for Dominic O'Connor Construction in Baltinglass, Co. Wicklow. Full post construction clean carried out to handover standard ahead of building occupation.

Two Hexaclean Solutions operatives in hard hats performing final clean in new-build facility Ireland

St. Vincent Dermatology — Medical Post Construction Clean, Dublin

Hexaclean Solutions completed a full medical builders clean and sparkle clean for Conack Construction at St. Vincent Dermatology. Carried out to the exacting hygiene and finish standards required for healthcare environments ahead of handover.

Dunnes Stores Retail Fit Out Clean — Kilrock Construction

Sparkle clean and builders clean completed for Kilrock Construction on a Dunnes Stores retail fit out. Full post fit out clean carried out to retail handover standard — every surface, every detail, ready for opening.

Marble sink detail cleaning in progress Sophie's Rooftop Dean Hotel

The Dean Hotel Dublin — Post Construction & After Builders Cleaning

Full post construction cleaning delivered at The Dean Hotel, Dublin city centre, following completion of building works. Guest rooms, communal areas, bathrooms and fittings cleaned to a hospitality-ready standard ahead of handover.

Office fit out cleaning in Sandyford showing cleaned washroom sinks, taps, mirrors and tiled surfaces ready for handover.

Sandyford Office Fit Out — After Builders Cleaning

A large multi-room office floor deep cleaned in a single day for Logical Real Estate Consulting, including two kitchens, two toilets and a staircase. A full window deep clean was added on the spot, delivered without delaying the scheduled inspection.

Post-construction office cleaning inside a construction site cabin in Dublin, professionally cleaned workspace ready for handover

Hitachi Energy Ireland — Construction Site Cabin Cleaning, 2 Sites

Ongoing construction site cabin cleaning delivered across two large Hitachi Energy Ireland sites. Multiple office structures, meeting rooms, canteens, drying rooms and toilets maintained to a high standard throughout the full duration of both projects.

Office fit out before after builders cleaning with construction dust and unfinished reception area in Dublin.

Office Fit Out Cleaning — Sandyford

Full Level 1 post-construction clean delivered in two days for Fire Containment, including commercial carpet extraction, ceiling cleaning, toilets and welfare areas. Coordinated around live electrical work on site, finished faster than the client expected.

Retail fit-out cleaning team working on a shopfront in Dundrum, Dublin during post-construction cleaning before store handover.

Bershka Dundrum Town Centre — Retail Fit Out Cleaning

Full retail fit out cleaning delivered at Bershka's new store, Dundrum Town Centre, working around live construction and a fixed daily opening deadline. Sales floor, fitting rooms, stockroom and storefront glazing cleaned to a trading-ready standard, finished before the centre opened every single morning.

Luxury home development during post-construction and after builders cleaning for a Contempo project in Dublin.

Luxury Residential Development — Blackrock

Post-construction deep clean and sparkle clean delivered across two visits for a high-specification Blackrock development. Marble worktops, tiled surfaces and extensive glazing cleaned with material-specific care, photo-documented and manager-inspected at every stage.

Completed Dunnes Café at Beacon Court, Sandyford following final sparkle and post-construction cleaning of the retail fit-out.

Dunnes Stores Beacon Court — After Builders Cleaning

Multi-zone after builders cleaning delivered across Dunnes Stores' new Beacon Court site for Kilrock Construction, covering two retail zones, a commercial kitchen and café, and staff facilities — over 1,500m² in total. Cleared every morning between 5:00am and store opening, working around live trades and delicate finishes throughout.