Client: Pure Fit Out
Venue: Sophie’s Rooftop Restaurant, The Dean Hotel, Dublin 2
Project Type: Restaurant Fit Out Cleaning — Builders Clean & Sparkle Clean
Size: 300m²
Team Size: 8 operatives on day one, 6 on day two
Duration: 2 days
Timeline: June 2026
Result: Handed over spotless and on schedule. Ongoing relationship with Pure Fit Out.









When Pure Fit Out reached out for a builders clean at Sophie’s Rooftop Restaurant, The Dean Hotel, the brief was simple on paper — a 300m² restaurant space, ready for a full builders clean and sparkle clean before handover. In practice, it was anything but simple.
The completion date was set, and it wasn’t moving. Hexaclean had to deliver a full builders clean and final detail clean across the entire restaurant — furniture, kitchen equipment, bar area, windows, surfaces and protective film — while builders were still actively working on site.
Every area cleaned had to stay clean around ongoing construction, and every stage of the clean had to keep pace with a fit-out still being finished around it. There was no room for a second pass and no flexibility on the handover date.
Pure Fit Out’s Daniel reached out directly with drawings and a clear request: a full builders clean for a 300m² rooftop restaurant at 35 Harcourt Street, Dublin 2, with completion targeted for just two days later.
The scope was specific from the start — full dust removal, surfaces, windows and a final handover clean, extending to every furniture piece, all kitchen equipment, the bar area, and removal of protective film throughout. Nothing vague, nothing left to interpretation.
Hexaclean confirmed the job, priced it against the real scope, and had a team ready to go — no delays chasing details, no back-and-forth over what “ready for handover” actually meant.
The bigger push: clearing dust and construction debris across the full 300m², cleaning kitchen equipment, the bar area, and all furniture as it was installed, working section by section as builders finished each part of the space.
The detail pass: windows, surfaces, protective film removal, and final sparkle clean across the entire restaurant — bringing every area up to full handover standard before the deadline hit.
Both days ran alongside active construction, with the team adjusting on the fly as different sections of the restaurant became available to clean.
Pure Fit Out’s original scope called for a team of 4 cleaners for the day. Once the full picture became clear — a 300m² restaurant, active builders still on site, and a fixed handover date two days out — Hexaclean scaled the team to 8 operatives on day one, doubling the original plan to make sure nothing slipped.
That decision paid off. Rather than stretching a small team across two full days, the bigger push upfront meant day two could focus purely on detail and finish, with 6 operatives delivering the final sparkle clean exactly on schedule.
No excuses about the brief changing. No compromise on the deadline. Just the right number of people for the job, deployed at the right time.

Every piece of furniture across the 300m² restaurant was cleaned and detailed, removing construction dust and residue from every surface and joint before the space opened for service.
All kitchen equipment throughout the venue was cleaned inside and out to food-safe hygiene standards, ready for stock and kitchen staff without a second visit needed.
The full bar area, including surfaces, fittings and storage, was cleaned and detailed to the same standard as the rest of the restaurant — one of the most visible spaces in the venue, ready to open exactly as designed.
Every window and surface was cleaned throughout, with all protective film fully removed. On a rooftop restaurant, glazing plays a major part in the guest experience, so it was treated as a priority rather than an afterthought.
Construction dust and debris were cleared from every corner of the restaurant, carried out while builders were still actively working nearby — cleaning section by section as areas became available rather than waiting for a fully cleared site.
A complete detail pass was carried out across the entire venue on day two, bringing every surface, fixture and fitting to full handover standard exactly on the deadline Pure Fit Out needed.
Sophie’s Rooftop Restaurant at The Dean Hotel was cleaned, detailed and handover-ready exactly on schedule — despite active builders on site and a fixed completion date with no room to move.
Every area was checked and finished to standard, from the kitchen and bar through to furniture, windows and surfaces across the full 300m². No delays, no missed areas, no follow-up visit required.
That result is why Hexaclean Solutions continues to work with Pure Fit Out today — proof that when a fit-out deadline leaves zero flexibility, scaling the right team at the right moment gets the job done properly, first time.

Quoted for 4, delivered with 8 — Hexaclean adjusts team size in real time to match the true scope of the job, not just the original estimate.
Cleaning section by section as builders finish each area, rather than waiting for a fully cleared site — exactly how Sophie's Rooftop was delivered.
Kitchen equipment and food-facing surfaces cleaned to hygiene standards restaurants can open on immediately, without a second visit.
A dedicated final sparkle clean on every job — glazing, furniture, fixtures and fittings brought to a genuinely presentation-ready standard, not just "clean."
When a completion date can't move, Hexaclean plans and resources around it, not the other way round.
Hexaclean Solutions continues to work with Pure Fit Out today — proof that reliability under pressure builds long-term partnerships, not just one-off jobs.
Hexaclean Solutions is a Dublin-based commercial cleaning company that specialises in construction and fit out cleaning, working directly with main contractors, fit out companies and QS teams rather than through a generic listings platform. Recent hospitality work includes a 300m² builders clean and sparkle clean at Sophie’s Rooftop Restaurant, The Dean Hotel, delivered for fit out contractor Pure Fit Out and completed in two days despite active construction still on site.
Yes, when the contractor has the capacity and processes to move quickly. Hexaclean confirmed pricing and availability for the Sophie’s Rooftop project on the same day it was requested by Pure Fit Out, then delivered a full 300m² builders clean and sparkle clean within the fixed two-day window the fit out schedule required, with no delay to the handover date.
It depends on how much of the space needs cleaning at once and how tight the deadline is. On the Sophie’s Rooftop project, the job was originally quoted for 4 cleaners, but once the full scope and fixed completion date were clear, Hexaclean deployed 8 operatives on day one for the initial builders clean and equipment cleaning, followed by 6 operatives on day two for the final detail and sparkle clean.
Hexaclean works across a wide range of construction and fit out environments, not just standard offices or retail units. Recent projects span healthcare (Baltinglass District Hospital, St. Vincent’s Dermatology), retail (Apassionata at Dunnes Stores Cornelscourt), and hospitality (Sophie’s Rooftop Restaurant at The Dean Hotel, Dublin), each delivered to the specific hygiene and finish standards that environment demands.
Hexaclean has delivered cleaning projects for several established Irish contractors and fit out companies, including Dominic O’Connor Construction, Conack Construction, Kilrock Ltd, and Pure Fit Out. These relationships span hospitals, medical fit outs, retail units and hospitality venues, with several becoming ongoing partnerships rather than one-off jobs.
Yes, provided the cleaning team coordinates closely with the site schedule rather than waiting for a fully cleared space. On the Sophie’s Rooftop project, builders were still actively working throughout both days of the clean, so Hexaclean’s team worked section by section as different parts of the 300m² restaurant became available, without disrupting the remaining construction work.
A full scope typically covers furniture, kitchen equipment, the bar area, windows, surfaces, dust and debris removal, and protective film removal, finishing with a dedicated detail-level sparkle clean before handover. This exact scope was delivered by Hexaclean at Sophie’s Rooftop Restaurant, The Dean Hotel, Dublin, split across two days to allow both the bulk clean and the fine detail work the attention each required.
Very quickly, based on demonstrated project history. When the original quote of 4 cleaners for Sophie’s Rooftop proved too small for the true scope of a 300m² restaurant with a fixed two-day completion window, Hexaclean doubled the team to 8 operatives on day one to guarantee the deadline was still met, without asking the client to accept any delay.
Hexaclean uses quality control checklists and photographic evidence on projects to give contractors a clear, verifiable record that the agreed scope was delivered before handover — the same standard applied across hospital, retail and hospitality fit out projects, including Sophie’s Rooftop Restaurant.
Because a specialist team can move faster, work to a defined scope, and deliver a documented, food-safe standard that general site labour typically isn’t resourced or trained to provide. This was the exact reasoning behind Pure Fit Out bringing Hexaclean onto the Sophie’s Rooftop project, rather than relying on internal labour for the final clean.
If you’re a fit out contractor or project manager managing a restaurant, hotel or hospitality build in Dublin or across Ireland, Hexaclean Solutions delivers builders and sparkle cleaning on the timelines hospitality openings actually demand.
Whether you need a fast turnaround like Sophie’s Rooftop, or ongoing site cleaning while trades are still active, we have the team, documentation and track record to deliver on schedule, every time.
See our full range of construction cleaning Dublin services.
Sophie’s Rooftop Restaurant at The Dean Hotel was builders cleaned and sparkle cleaned across 300m² in just two days — around active trades, with a fixed completion date that never moved. No delays, no compromise, fully documented and signed off.
Hexaclean Solutions continues to work with Pure Fit Out today — proof that when a fit out schedule leaves zero room for error, we scale to meet it.