Engineers Ireland
Featured in Engineers IrelandOur published article explains why final cleaning needs to follow the construction programme to support a successful project handover.
Read Our ArticleFrom 3,300 m² healthcare fit-outs to commercial office projects exceeding 2,000 m², your builders clean needs to be planned as carefully as the construction work itself. Tight deadlines, changing site conditions and multiple trades shouldn’t leave you guessing about labour, progress or what’s ready for inspection.
Get a cleaning programme that works with your schedule and budget, with completed areas checked and progress documented. So when handover approaches, you know exactly where things stand.
























Sandyford, Dublin | 2,100 m² Logical Builders clean and final sparkle across multiple floors, coordinated around ongoing works and tenant walkthroughs.

Dundrum, Dublin | 640 m² | CITANIAS Builders clean for a retail fit-out, preparing the store for its final presentation.

Dublin 2 | 750 m² | FKM Detailed builders clean and glazing work around active trades, followed by final presentation cleaning.

Get an indicative cleaning budget for your project before requesting a formal quotation.
Send your project details for a quotation based on your actual floor areas, site condition and cleaning scope.
Request My Quotation ↗Your site manager is told a room is finished, but the inspection tells a different story. Dust, adhesive and missed details are still there. Now the room needs another clean, and your team has to explain why it wasn't ready.
A room is cleaned on Monday, electricians return on Tuesday, and by Wednesday it needs cleaning again. Without a record of when the area was completed, agreeing what's a snag and what's additional work becomes difficult.
Your client brings a walkthrough forward, trades fall behind or access becomes available earlier than expected. Your cleaning schedule needs to adjust without leaving you short of labour when it matters.
One wrong cleaning product on specialist flooring, an unsuitable scraper on glazing or an abrasive pad on stainless steel can leave you with an expensive problem just before handover.
One careless cleaner can permanently damage expensive flooring, glazing or fittings. Weeks of skilled workmanship ruined in minutes by the wrong cleaning method.
The team arrives, but Safe Pass records, manual handling certificates or site-specific RAMS haven't been organised. Work can't start as planned, and your site manager is left sorting paperwork instead of getting areas ready for inspection.
When you’re managing a builders clean in Dublin, you need to know which areas are ready for inspection, how much work remains and whether the cleaning is keeping pace with your construction programme. At Burton Court in Sandyford, approximately 2,100 m² of office space required phased cleaning across multiple floors ahead of tenant walkthroughs. At Grand Canal Square, active trades and stubborn glazing residue meant the cleaning plan had to adapt on site. Whether your project needs an initial clean or a final post-construction clean, the priority is the same: clear progress, agreed costs and no surprises when your client arrives.
At St Vincent's Dermatology, the 3,300 m² healthcare fit-out included noraplan rubber flooring. The manufacturer was consulted to establish the correct cleaning procedure, helping protect the newly installed finish.
At Grand Canal Square, stubborn construction adhesive remained on glazing and window frames. Removal products were selected and tested against the surfaces to avoid damage during the final clean.
At Dunnes Stores in Beacon Court, glazing beneath a decorative structure presented access challenges. Extendable poles and specialist access equipment helped reach areas that couldn't be cleaned safely from floor level.
Why pay to clean the same area twice? At Grand Canal Square, working with FKM, a room-by-room cleaning approach helped protect approximately €2,000 in potential repeat-cleaning costs. Completed rooms were photographed before and after cleaning, with their condition documented before being closed off to further trades. This gave the site team evidence of what had already been cleaned and helped identify responsibility if an area was dirtied again. By coordinating cleaning with completed works, controlling access and allocating labour where it’s needed, you can avoid paying twice for the same job and keep more of your budget available for the final handover.

Share your floor plans, cleaning specification and target dates. If you're still working out the scope, that's fine too. We'll review what you've got and identify anything that needs clarifying.
We'll check floor areas, glazing, finishes, access restrictions and the condition of the site. Where drawings and actual measurements differ, we'll flag it before finalising the price.
Receive a quotation outlining what's included, the proposed cleaning stages, labour requirements and any exclusions. You'll know what you're allowing for in your budget before committing.
Once approved, we'll coordinate with your site manager, prepare the required documentation and schedule the team around your available work areas and handover dates.
Industry Membership & Publications
Our published article explains why final cleaning needs to follow the construction programme to support a successful project handover.
Read Our ArticleHexaclean Solutions is a member of Construction IT Alliance, connecting our business with professionals across Ireland's construction sector.
View Our MembershipOur feature discusses the pressure of construction handovers and the importance of properly planned after builders cleaning.
Read Our FeatureFor budgeting purposes, commercial builders cleaning in Dublin can start from approximately €4.70/m², with the rate per square metre generally decreasing on larger projects. For example, a 500 m² fit-out at €4.70/m² would cost approximately €2,350 + VAT. A 2,000 m² project may qualify for a lower rate due to economies of scale and more efficient labour allocation. The final price depends on the condition of the site, glazing, specialist finishes, access requirements and cleaning stages. Send your drawings for a project-specific quotation so your budget reflects the actual work required, rather than a flat rate applied to every building.
Yes. Send your floor plans, cleaning specification, proposed dates and any available site photographs. You can receive an initial estimate before arranging a walkthrough. At Burton Court in Sandyford, the cleaning scope covered approximately 2,100 m² across several floors. Projects of that scale benefit from reviewing the actual layout, glazing and cleaning stages rather than relying on floor area alone.
That depends on the agreed scope. An initial builders clean removes construction dust and residue, while a final sparkle addresses presentation details closer to handover. If both stages are required, they can be priced together and scheduled separately. You can find more detail about the different cleaning stages on our after-builders cleaning page.
Yes. Once your drawings, cleaning specification and site conditions have been reviewed, you can receive a fixed-price quotation with clearly defined inclusions and exclusions.
For larger projects, cleaning can be priced by floor or phase, making it easier to allocate costs against your construction budget. Any work outside the agreed scope is discussed and priced separately before proceeding.
Yes, provided suitable areas can be made available safely.
At Dunnes Stores in Beacon Court, Sandyford, cleaning was coordinated around ongoing construction and retail operations. Rather than waiting for the entire site to finish, available sections were cleaned in stages, with access and priorities agreed with site management.
Yes. Send your drawings, BOQ or cleaning specification, and we’ll prepare a quotation based on the proposed scope, floor areas and programme. We can provide a breakdown by floor or cleaning stage where required, helping you include a realistic cleaning allowance in your tender before the project starts.
You don't necessarily need to cancel the entire clean. If some rooms are ready and others still have trades working, the available areas can be prioritised. At Grand Canal Square, the cleaning team had to work around active construction and difficult adhesive removal. The programme was adjusted on site, including increasing the team from five to eight operatives for the main cleaning day. Any additional visits or changes to the agreed scope should be discussed before extra costs are incurred.
Your site team may request site-specific RAMS, Safe Pass records, manual handling training evidence, insurance details and relevant equipment inspection records. These requirements should be confirmed before mobilisation, particularly where access equipment or high-level cleaning is involved. The Health and Safety Authority's site-specific safety guidance explains the importance of assessing risks for the actual work and location. hsa.ie
Yes. You can have your initial builders clean and final sparkle priced separately, giving you a clear breakdown of costs for each stage of your project. This is particularly useful on larger office and retail fit-outs where cleaning needs to take place across different dates. At Burton Court in Sandyford, approximately 2,100 m² of office space required cleaning across multiple floors, with final touch-ups arranged ahead of tenant walkthroughs. By separating the cleaning stages, you can allocate labour to areas that are ready, avoid unnecessary repeat visits and keep the final sparkle closer to handover. Your quotation can also identify the glazing, specialist cleaning and any exclusions, so you know exactly what's included in each stage.
Get your builders cleaning priced from your drawings, with a clear scope, realistic labour allowance and costs you can account for before work begins. Whether it’s a 500 m² retail fit-out or a 3,000 m² commercial development, get a quotation that reflects your actual project requirements.